Jump to content

AU13HSV

Members
  • Posts

    18
  • Joined

  • Last visited

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

AU13HSV's Achievements

Apprentice

Apprentice (3/14)

  • First Post
  • Collaborator
  • Reacting Well
  • Week One Done
  • One Month Later

Recent Badges

13

Reputation

  1. Someone at the University must have mistakenly put up the BOE meeting material that included more renderings. For about a day they have about 10-12 renderings listed. Showing much more detailed renderings. It looks like these didn't make the final document though. The lobby has 2 story wall covering jumbotron screens. The weightroom has a 4 sided diamond hanging screen from the middle of the room. The interiors are much more modern (lots of glass and steel looks) than the outside appears.
  2. There aren't two recording studios. Recording studios consist of two rooms one for recording and the other for the sound engineer. NFL teams recruit by paying the most. Colleges recruit by showing 16, 17, and 18 year olds how much fun they could have here.
  3. Sorry, It looks like it was uploaded to the BOE site by mistake and their link has been removed. I have a copy of the PDF, but not sure how to upload here without a good link.
  4. Football Performance Center is going before the Board next month for final approval. Page 20 of the attached board materials gives more insight on the center. 233,400 square feet, $91.9 million budget, completion expected July 2022. There are better renderings attached. I was underwhelmed with the initial look, but these renderings have me a little more excited. materials-20210205.pdf (auburn.edu)
×
×
  • Create New...