subterranean_jack 112 Posted June 1, 2015 Share Posted June 1, 2015 Jedi pilot: Are you crazy? No one can hit that target. Luke Skywalker: Sure you can. Back home on Tantooine, me and Biggs Darklighter used to shoot womp rats smaller than that.... Link to comment Share on other sites More sharing options...
IronMan70 3,277 Posted June 2, 2015 Share Posted June 2, 2015 au_bsci_04, on Today, 05:50 PM, said: Additional info on scoreboard: Will incorporate (9) 20'x50' 12mm HD screens @ 3,400 lbs each w/ an active display area of 56'x190' Chase behind video boards to be fully ducted, sourced by (3) 10T units providing a required total of 30T of cooling Overall structure sizing 201'x105' Speaker section 15'x50' 8'x12' camera bay/fireworks platform at the top corner of each side Backside will be enclosed with 2" insulated metal panels with the field color being a bronze and accent bands in tan There does not appear to be any additional structural framing on the sides other than the connection to the existing vertical columns (2 on each side) There does not seem to be any structural sheathing being installed, so my assumption is that any horizontal shear loads are being designed into the cross-bracing. I'll try to upload some photos. ====================================================================================== Thanks for providing that information and the subsequent detailed drawing photos. That is some very good information. Link to comment Share on other sites More sharing options...
au_bsci_04 407 Posted June 2, 2015 Share Posted June 2, 2015 au_bsci_04, on Today, 05:50 PM, said: Additional info on scoreboard: Will incorporate (9) 20'x50' 12mm HD screens @ 3,400 lbs each w/ an active display area of 56'x190' Chase behind video boards to be fully ducted, sourced by (3) 10T units providing a required total of 30T of cooling Overall structure sizing 201'x105' Speaker section 15'x50' 8'x12' camera bay/fireworks platform at the top corner of each side Backside will be enclosed with 2" insulated metal panels with the field color being a bronze and accent bands in tan There does not appear to be any additional structural framing on the sides other than the connection to the existing vertical columns (2 on each side) There does not seem to be any structural sheathing being installed, so my assumption is that any horizontal shear loads are being designed into the cross-bracing. I'll try to upload some photos. ====================================================================================== Thanks for providing that information and the subsequent detailed drawing photos. That is some very good information. I got something good coming for you buddy, stay tuned! Link to comment Share on other sites More sharing options...
The Plainsman 948 Posted June 2, 2015 Share Posted June 2, 2015 au_bsci_04, on Today, 05:50 PM, said: Additional info on scoreboard: Will incorporate (9) 20'x50' 12mm HD screens @ 3,400 lbs each w/ an active display area of 56'x190' Chase behind video boards to be fully ducted, sourced by (3) 10T units providing a required total of 30T of cooling Overall structure sizing 201'x105' Speaker section 15'x50' 8'x12' camera bay/fireworks platform at the top corner of each side Backside will be enclosed with 2" insulated metal panels with the field color being a bronze and accent bands in tan There does not appear to be any additional structural framing on the sides other than the connection to the existing vertical columns (2 on each side) There does not seem to be any structural sheathing being installed, so my assumption is that any horizontal shear loads are being designed into the cross-bracing. I'll try to upload some photos. ====================================================================================== Thanks for providing that information and the subsequent detailed drawing photos. That is some very good information. I got something good coming for you buddy, stay tuned! Bring it!! Link to comment Share on other sites More sharing options...
WarTiger 3,901 Posted June 2, 2015 Share Posted June 2, 2015 Additional info on scoreboard: Will incorporate (9) 20'x50' 12mm HD screens @ 3,400 lbs each w/ an active display area of 56'x190' Chase behind video boards to be fully ducted, sourced by (3) 10T units providing a required total of 30T of cooling Overall structure sizing 201'x105' Speaker section 15'x50' 8'x12' camera bay/fireworks platform at the top corner of each side Backside will be enclosed with 2" insulated metal panels with the field color being a bronze and accent bands in tan There does not appear to be any additional structural framing on the sides other than the connection to the existing vertical columns (2 on each side) There does not seem to be any structural sheathing being installed, so my assumption is that any horizontal shear loads are being designed into the cross-bracing. I'll try to upload some photos. Great info. Thanks for sharing... Link to comment Share on other sites More sharing options...
IronMan70 3,277 Posted June 2, 2015 Share Posted June 2, 2015 au_bsci_04, on Today, 09:10 PM, said: I got something good coming for you buddy, stay tuned! ================================================================================= MOST excellent !!!!! I've been looking at those drawings at 150%, good stuff. That front section of the 9 panels must be a smaller version (width 74' 5 1/8") before we bought BIG Aubie. Link to comment Share on other sites More sharing options...
auburn4ever 1,266 Posted June 2, 2015 Share Posted June 2, 2015 Wish they would add more seats as fast as their putting up that new scoreboard Link to comment Share on other sites More sharing options...
NoALtiger 3,860 Posted June 2, 2015 Share Posted June 2, 2015 Of course you do. Link to comment Share on other sites More sharing options...
AUEngineer2016 407 Posted June 2, 2015 Share Posted June 2, 2015 All I see when I see pictures are a system of trusses that I need to do a force analysis on. Darn you Mechanical Engineering classes, you take all of the fun out of everything.... Link to comment Share on other sites More sharing options...
RunInRed 16,407 Posted June 2, 2015 Author Share Posted June 2, 2015 Great info au_bsci_04 ... thanks for sharing! Link to comment Share on other sites More sharing options...
tigerchris 243 Posted June 2, 2015 Share Posted June 2, 2015 I'd like to know the sound specs. Is that available yet? Link to comment Share on other sites More sharing options...
au_bsci_04 407 Posted June 2, 2015 Share Posted June 2, 2015 au_bsci_04, on Today, 09:10 PM, said: I got something good coming for you buddy, stay tuned! ================================================================================= MOST excellent !!!!! ;D/> I've been looking at those drawings at 150%, good stuff. That front section of the 9 panels must be a smaller version (width 74' 5 1/8") before we bought BIG Aubie. Sorry for this guys, but I'll be PMing the good news to Ironman at the request of my contact. Link to comment Share on other sites More sharing options...
logan adams 333 Posted June 2, 2015 Share Posted June 2, 2015 The tie-in to the future NEZ expansion and view the board will provide to those premium seats is vastly understated ... I've heard nothing of a north end zone expansion. Is this a thing? I saw one feasibility study that Auburn recently had which in turn will decrease overall capacity, so I wouldn't call it much of an expansion. Link to comment Share on other sites More sharing options...
AU-24 3,074 Posted June 3, 2015 Share Posted June 3, 2015 How many Flux Capacitors? Hoping for at least three. Link to comment Share on other sites More sharing options...
WarTiger 3,901 Posted June 3, 2015 Share Posted June 3, 2015 Wish they would add more seats as fast as their putting up that new scoreboard Yeah, we know. You post the same tired stuff in every thread that even remotely relates to the topic. We get it... Please move on.. Link to comment Share on other sites More sharing options...
RunInRed 16,407 Posted June 3, 2015 Author Share Posted June 3, 2015 Link to comment Share on other sites More sharing options...
IronMan70 3,277 Posted June 3, 2015 Share Posted June 3, 2015 Getting bigger every day. Can you imagine, when a critical defensive stand takes place, and the word DEFENSE in huge letters is flashing on that board as the Auburn fans chant, DEFENSE, DEFENSE, DEFENSE, DEFENSE. It's just going to be wild I tell ya. Link to comment Share on other sites More sharing options...
FHeal 4 Posted June 3, 2015 Share Posted June 3, 2015 Getting bigger every day. Can you imagine, when a critical defensive stand takes place, and the word DEFENSE in huge letters is flashing on that board as the Auburn fans chant, DEFENSE, DEFENSE, DEFENSE, DEFENSE. It's just going to be wild I tell ya. Hmmm... could be quite the sight for an opposing QB and think about a gazillion LEDs spooking a newby kicker. (nah not fair) Link to comment Share on other sites More sharing options...
logan adams 333 Posted June 3, 2015 Share Posted June 3, 2015 Not much discussion is going on with the sideline banners on the upper decks, but I'm also excited to see those as well. I think they'll make more a difference than a lot of people realize. Link to comment Share on other sites More sharing options...
ausaxman 27 Posted June 3, 2015 Share Posted June 3, 2015 Not much discussion is going on with the sideline banners on the upper decks, but I'm also excited to see those as well. I think they'll make more a difference than a lot of people realize. A few days ago I was driving across campus and noticed a large number of metal boxes in the collesium parking lot. Upon closer inspection, I saw that they were marked as the banners. I'm really excited to see them up in JHS. I just hope they cover the length of the upper deck. Link to comment Share on other sites More sharing options...
logan adams 333 Posted June 4, 2015 Share Posted June 4, 2015 Not much discussion is going on with the sideline banners on the upper decks, but I'm also excited to see those as well. I think they'll make more a difference than a lot of people realize. A few days ago I was driving across campus and noticed a large number of metal boxes in the collesium parking lot. Upon closer inspection, I saw that they were marked as the banners. I'm really excited to see them up in JHS. I just hope they cover the length of the upper deck. They will be from end to end. Link to comment Share on other sites More sharing options...
auburn4ever 1,266 Posted June 4, 2015 Share Posted June 4, 2015 When do then think the scoreboard will start going up? Link to comment Share on other sites More sharing options...
auburnphan 6,050 Posted June 5, 2015 Share Posted June 5, 2015 this summer, unless the orange face masks come in, then they will have to relocate resources. Link to comment Share on other sites More sharing options...
RunInRed 16,407 Posted June 5, 2015 Author Share Posted June 5, 2015 Link to comment Share on other sites More sharing options...
AUEngineer2016 407 Posted June 5, 2015 Share Posted June 5, 2015 Looking good! From that angle, it looks like the student section will still be able to throw made FG and Extra Point footballs out the back! Woo! Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.