Jump to content

New Scoreboard - Construction Progress


RunInRed

Recommended Posts

About 15 minutes ago they set the beam in place that was signed by the Seniors. A flag was attached and the I-beam was placed on the front edge of the frame supporting the sound system. Scroll back on the vid if you want to see it.

The final beam being bolted into place ...

image.jpg

Photo: David Topper

Final beam? So infrastructure for the video board and speaker are done?

Link to comment
Share on other sites





  • Replies 1.5k
  • Created
  • Last Reply

Yes, it looks like more panels are going up. With the zoom now set further back than it was before, its harder to see the details of what is going on. At night, the glare of the floodlights makes it even more difficult at this distance. Too bad they don't have the zoom set the same as they did before.

Link to comment
Share on other sites

It'd be great if there was a timelapse of this entire process

That might be possible if they didn't keep moving the cameras. Hopefully someone thought ahead and is recording a time lapse from a different camera.

Link to comment
Share on other sites

Back shot ...

image.jpg

Adds a completely different look to the stadium.

I can't wait to see what the backside will look like when it's completed.

Link to comment
Share on other sites

Back shot ...

image.jpg

Adds a completely different look to the stadium.

I can't wait to see what the backside will look like when it's completed.

Wonder if any wind studies were (or have) been done ? Without any background in such, I could see certain situations where air flow (or current disruption) could be affected.

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.




×
×
  • Create New...